Collection
Tumbler / Mug
Stock moulds open to colour, logo and lid changes — send the drawing and we match the series to your channel.
All
Coffee Maker/Pot
Glass Water Bottle
Insulated Wine Cooler
Plastic Water Bottle
Stainless Steel Water Bottle
Tumbler / Mug
Water Jug
7 products
Bestseller
Stainless Steel Tumbler with Handle and Straw
Insulated Mug for Coffee Mug Tea Cup
Vacuum Insulated Sport Tumbler with Straw
40 oz Tumbler with Handle and Straw Lid
Insulated Coffee Mug with Straw
50oz/67oz Insulated Tumbler with Handle and Straw Lid
15oz Portable Glass Coffee Mug with Silicone Protective Sleeve
| Capacity range | 12 oz / 17 oz / 20 oz / 24 oz / 32 oz / 40 oz / 64 oz (350–1,900 ml) |
|---|---|
| Material | 304 (18/8) or 316 food-grade stainless steel, double-wall vacuum |
| Finish | Powder coat matte, gloss, gradient, sublimation, brushed steel |
| Logo | Laser engraving, silk screen, UV transfer, 3D emboss |
| MOQ | 500 pcs per colour (stock moulds) · 3,000 pcs for new tooling |
| Lead time | Samples 7 days · production 30–35 days after approval |
FAQ
Stainless steel bottles, in plain numbers.
Capacity, grade, tooling and lead time — the four answers that decide whether a project moves.
All questionsWhich capacities can I order in one colourway?
Any mix of 12, 17, 20, 24, 32, 40 and 64 oz, provided each size clears 500 pcs. Colours are shared across sizes, so a 500 pcs run can be split across three sizes and still hold one coating batch.
304 or 316 — which should I specify?
304 for water, coffee and tea. 316 only when the bottle lives near salt — coastal markets, marine brands, electrolyte drinks.
Can the lid be changed without new tooling?
On most bodies, yes — straw, flip-straw and slide lids share the same thread diameter. A change of thread or a handle requires a new lid mould: 25 days and quoted separately from the body.
What is the lead time on a repeat order?
22–28 days for a repeat colourway with the artwork on file, against 30–35 days for a first run. Sampling stays at 7 working days either way.
Need a capacity that is not listed?
New moulds take 25 days to cut. Send the drawing and we will quote the tooling separately.