Quality control

Cuatro puertas. Una de ellas es aleatoria.

Un defecto detectado después del recubrimiento cuesta unas diez veces más que detectarlo antes. Por eso el plan se basa en detectarlo pronto y luego demostrarlo con un documento que puedas adjuntar a una reclamación.

5–20%Finished goods pulled at random
100%Leak test on vacuum bodies
AQL 2.5Final inspection standard
24 hPrueba de retención térmica

Gate 1 — incoming material

Nothing is released to a line until the material matches the drawing and the grade matches the certificate.

  • Steel. Grade check (304 or 316) against the mill certificate, thickness measured on a sample per coil, surface inspected for lamination and scratches.
  • Plastic resin. Se registran el grado y el lote: Tritan, PP o AS. La sustitución de resina es la causa más frecuente de quejas por sabor, así que el número de lote queda en el registro del lote de fabricación.
  • Silicone and lids. Hardness and smell check. Gaskets are torque-tested on a sample of the incoming lot.
  • Mould. Inspección de la cavidad y una primera pieza antes de liberar la producción.

Gate 2 — in process

This is where a factory either has a system or has an opinion. Ours is a check sheet per station, signed per shift:

  • Costura de soldadura: inspección visual y de pérdida de vacío en el 100 % de los cuerpos al vacío, no en una muestra.
  • Wall thickness and capacity: measured against the drawing every 2 hours.
  • Coating: film thickness, colour against the approved standard, and cross-hatch adhesion per batch.
  • Impresión: registro, prueba de curado y prueba de lavado en las primeras 50 piezas de cada montaje.

Gate 3 — performance

Every order runs the same five tests before it can be packed. The numbers are the acceptance criteria, not marketing.

PruebaMethodAcceptance
LeakInverted, filled, 30 minNo seepage at the seam or the lid thread
InsulationBoiling water, 24 h ambient≥ 62 °C retained for a 500 ml vacuum body
Cold retentionAgua con hielo, 24 h a temperatura ambienteIce still present at 24 h for double-wall
Adherencia del recubrimientoCross-hatch, ASTM D3359Class 4B or better after 500 dishwasher cycles
DropPacked carton, 80 cm, 6 facesNo unit damage, carton intact

Gate 4 — pre-shipment

Between 5% and 20% of finished pieces are pulled at random by international sampling standard, depending on the order value and the buyer's history. The inspector checks measurement, appearance, function and packaging, then signs the AQL 2.5 sheet. Photographs of the actual cartons go to the buyer before the container is sealed.

What you get with the shipment

Batch record, inspection sheet, material certificate, and photographs of the packed cartons. If a claim is ever raised, these four documents are the defence — or the admission.

When something goes wrong

Send photographs and the batch number from the carton label. We open the batch record, identify the station, and answer within two business days with one of three outcomes: replacement, credit, or an explanation of why the goods are within the agreed specification. The third answer is the one buyers find hardest to get elsewhere, and the one that saves the most arguments later.

Inspección por terceros

SGS, TÜV, Bureau Veritas and Intertek are all welcome, and we will schedule the line around the inspector's date. We do not charge for access to the plant, and we do not ask to see the report first.

Want the inspection sheet before you order?

We will send the blank AQL form and the batch record template. If your QA team wants an extra test, add it to the spec and we will price it.

Request a Quote